6.0 KiB
6.0 KiB
Implementation Checklist: Unified Refresh System
📋 Step-by-Step Implementation Guide
Phase 1: Foundation (Day 1) ⚡ CRITICAL
✅ Step 1.1: Create Refresh Manager
- Create
lib/services/refresh-manager.ts - Test singleton pattern
- Test register/unregister
- Test start/stop
- Test deduplication logic
Estimated Time: 2-3 hours
✅ Step 1.2: Create Request Deduplication
- Create
lib/utils/request-deduplication.ts - Test deduplication with same key
- Test TTL expiration
- Test cleanup
Estimated Time: 1 hour
✅ Step 1.3: Create Constants
- Create
lib/constants/refresh-intervals.ts - Define all intervals
- Export helper function
Estimated Time: 30 minutes
✅ Step 1.4: Create Unified Hook
- Create
hooks/use-unified-refresh.ts - Test registration on mount
- Test cleanup on unmount
- Test manual refresh
Estimated Time: 1-2 hours
Phase 2: Fix Critical Issues (Day 1-2) 🔴 URGENT
✅ Step 2.1: Fix Redis KEYS → SCAN
- Update
lib/services/notifications/notification-service.tsline 293 - Replace
redis.keys()withredis.scan() - Test with large key sets
Estimated Time: 30 minutes
✅ Step 2.2: Fix Notification Hook Memory Leak
- Fix
hooks/use-notifications.tsuseEffect cleanup - Remove function dependencies
- Test cleanup on unmount
Estimated Time: 1 hour
✅ Step 2.3: Fix Notification Badge Double Fetch
- Update
components/notification-badge.tsx - Remove duplicate useEffect hooks
- Add request deduplication
- Test single fetch per action
Estimated Time: 1 hour
Phase 3: Refactor Notifications (Day 2) 🟡 HIGH PRIORITY
✅ Step 3.1: Refactor useNotifications Hook
- Integrate unified refresh
- Add request deduplication
- Remove manual polling
- Test all functionality
Estimated Time: 2-3 hours
✅ Step 3.2: Update Notification Badge
- Remove manual fetch logic
- Use hook's refresh function
- Test UI interactions
Estimated Time: 1 hour
Phase 4: Refactor Widgets (Day 3-4) 🟢 MEDIUM PRIORITY
✅ Step 4.1: Refactor Calendar Widget
- Update
components/calendar.tsx - Use unified refresh hook
- Add request deduplication
- Test refresh functionality
Estimated Time: 1 hour
✅ Step 4.2: Refactor Parole Widget
- Update
components/parole.tsx - Use unified refresh hook
- Remove manual interval
- Test chat updates
Estimated Time: 1 hour
✅ Step 4.3: Refactor News Widget
- Update
components/news.tsx - Use unified refresh hook
- Add auto-refresh (was manual only)
- Test news updates
Estimated Time: 1 hour
✅ Step 4.4: Refactor Email Widget
- Update
components/email.tsx - Use unified refresh hook
- Add auto-refresh (was manual only)
- Test email updates
Estimated Time: 1 hour
✅ Step 4.5: Refactor Duties Widget
- Update
components/flow.tsx - Use unified refresh hook
- Add auto-refresh (was manual only)
- Test task updates
Estimated Time: 1 hour
✅ Step 4.6: Refactor Navigation Bar Time
- Create
components/main-nav-time.tsx - Update
components/main-nav.tsxto use new component - Use unified refresh hook (1 second interval)
- Test time updates correctly
- Verify cleanup on unmount
Estimated Time: 30 minutes
Phase 5: Testing & Validation (Day 5) ✅ FINAL
✅ Step 5.1: Memory Leak Testing
- Open DevTools Memory tab
- Monitor memory over 10 minutes
- Verify no memory leaks
- Check interval cleanup
Estimated Time: 1 hour
✅ Step 5.2: API Call Reduction Testing
- Open DevTools Network tab
- Monitor API calls for 5 minutes
- Verify deduplication works
- Count total calls (should be ~60% less)
Estimated Time: 1 hour
✅ Step 5.3: Performance Testing
- Test page load time
- Test widget refresh times
- Test with multiple tabs open
- Verify no performance degradation
Estimated Time: 1 hour
✅ Step 5.4: User Experience Testing
- Test all widgets refresh correctly
- Test manual refresh buttons
- Test notification updates
- Verify smooth UX
Estimated Time: 1 hour
🎯 Daily Progress Tracking
Day 1 Target:
- Phase 1: Foundation (Steps 1.1-1.4)
- Phase 2: Critical Fixes (Steps 2.1-2.3)
Status: ⏳ In Progress
Day 2 Target:
- Phase 3: Notifications (Steps 3.1-3.2)
Status: ⏸️ Pending
Day 3 Target:
- Phase 4: Widgets Part 1 (Steps 4.1-4.2)
Status: ⏸️ Pending
Day 4 Target:
- Phase 4: Widgets Part 2 (Steps 4.3-4.5)
Status: ⏸️ Pending
Day 5 Target:
- Phase 5: Testing (Steps 5.1-5.4)
Status: ⏸️ Pending
🐛 Known Issues to Watch For
- Race Conditions: Monitor for duplicate requests
- Memory Leaks: Watch for uncleaned intervals
- Performance: Monitor API call frequency
- User Experience: Ensure smooth refresh transitions
📊 Success Criteria
Must Have:
- ✅ No memory leaks
- ✅ 60%+ reduction in API calls
- ✅ All widgets refresh correctly
- ✅ No duplicate requests
Nice to Have:
- ✅ Configurable refresh intervals
- ✅ Pause/resume functionality
- ✅ Refresh status monitoring
- ✅ Error recovery
🔄 Rollback Plan
If issues arise:
- Keep old code: Don't delete old implementations immediately
- Feature flag: Use environment variable to toggle new/old system
- Gradual migration: Migrate one widget at a time
- Monitor: Watch for errors in production
📝 Notes
- All new code should be backward compatible
- Test each phase before moving to next
- Document any deviations from plan
- Update this checklist as you progress
Last Updated: Implementation Checklist v1.0